Inspections

Inspections are required throughout the process of the building permit. It is the responsibly of the applicant to contact the building department to schedule an inspection at a minimum of 24 hours in advance. Please do not email the office for inspection requests.

Inspections are required for Footing, Ratwall, Post Hole, Backfill, Visqueen, Framing, Insulation, Ice & Water Shield, Brick Flashing, Final, Certificate of Occupancy. The inspector may also require additional inspections based on the project. 

Normally the inspection can be conducted the next day. When calling for the inspection please have the address and permit number for the project ready. You will not be given a specific time and the inspector will not be able to call before he arrives, so please have the structure accessible between the times that you are given, usually AM inspections are 9:00 a.m. to 12:00 p.m. and PM inspections are 12:30 p.m. to 2:30 p.m. Failure to have access to the structure will result in a re-inspection fee.